Andrew Dickinson General Contractor:(509) 643-8184
Andrew Dickinson General Contractor:(509) 643-8184
BEFORE: Old roof before tear-off.
BEFORE: Old shingles have been removed.
AFTER: New asphalt shingles installed.
BEFORE: During tear-off of old roof's shingles.
BEFORE: New roofing before shingles.
AFTER: New asphalt shingles installed.
BEFORE: During tear-off of old roof's shingles.
AFTER: New asphalt shingles installed.
AFTER: New asphalt shingles installed.
AFTER: New metal roof (Front)
AFTER: New metal roof (Back)
BEFORE: During construction of new bathroom add on (outside)
AFTER: After construction of new bathroom addition before paint (outside)
AFTER: After construction and paint of new bathroom addition (outside)
AFTER: New bathroom addition, new shower installed (inside)
AFTER: New bathroom addition, new shower installed with accessories (inside)
AFTER: New bathroom addition, new toilet/window installed with accessories (inside)
BEFORE: Old shower before demo
AFTER: New shower with tile wall (before shower door was installed)
AFTER: Right side of new 5 ft. cedar fence (outside yard)
AFTER: Left side of new 5 ft. cedar fence (outside yard)
AFTER: Inside of new 5 ft. cedar fence (inside yard)