Andrew Dickinson General Contractor:(509) 643-8184
Andrew Dickinson General Contractor:(509) 643-8184

BEFORE: Old roof before tear-off.

BEFORE: Old shingles have been removed.

AFTER: New asphalt shingles installed.

BEFORE: During tear-off of old roof's shingles.

BEFORE: New roofing before shingles.

AFTER: New asphalt shingles installed.

BEFORE: During tear-off of old roof's shingles.

AFTER: New asphalt shingles installed.

AFTER: New asphalt shingles installed.

AFTER: New metal roof (Front)

AFTER: New metal roof (Back)

AFTER: Complete bathroom remodel (view from doorway)

AFTER: Complete bathroom remodel (view from shower)

BEFORE: During construction of new bathroom addition (outside)

AFTER: After construction of new bathroom addition before paint (outside)

AFTER: After construction and paint of new bathroom addition (outside)

AFTER: New bathroom addition, new shower installed (inside)

AFTER: New bathroom addition, new shower installed with accessories (inside)

AFTER: New bathroom addition, new toilet/window installed with accessories (inside)

BEFORE: Old shower before demo

AFTER: New shower with tile wall (before shower door was installed)

AFTER: Right side of new 5 ft. cedar fence (outside yard)

AFTER: Left side of new 5 ft. cedar fence (outside yard)

AFTER: Inside of new 5 ft. cedar fence (inside yard)